Jack's Posts in the trains.com Forum
New Seneca & Chetola Line Forum Post
         
    HOME BACK NEXT    

 

 

  Page 14

 

4-6-0 Shay
  Seneca & Chetola
Locomotives
 
 
2-8-0 Consolidation  Heisler
 
    CLICK THE PICTURES    
     
    Gazebo    
   
  Gazebo Finished Gazebo Gazebo in front of stores  
     
  Rebuilding Waterfall  
   
  Current waterfall Dismantled waterfall Waterfall raised 6 inches  
         
   
   Back Fill  Left end  Back of right tunnel  
         
   
  Picking Rocks  Right end  Tunnel entrance  
         
   
   Filled in from back  Finished back stones  Rocks for back of mountian  
         
   
   Back of inner tunnel entrance Waterfall with 5 new trees  Finished waterfall  
         
   
  Preserving trestle Stones to prevent mulch on track  Building mtn. for mine  
         
   
   Jack checks mine mtn.  Mine Entranced  Rear of mine  
                  
     
   Final touches  Future Engineer Round rock along pathways  
         
   
   4-6-0 and 2-8-0 Lettering  Lettered Heisler  Shay Lettered  
         
   
   Caboose Fleet Lettered 1  Caboose Fleet Lettered 2  At the Controls  
         
     
   Observation Car Re-lettered    Passenger Train Re-lettered  
         
   
  Laying mine spur Tipper and mine spur Tipper spur base  
         
HOME BACK NEXT   PAGE 14