![]() Jack's Posts in the trains.com Forum New Seneca & Chetola Line Forum Post |
![]() |
||||||||
| HOME BACK NEXT | |||||||||
|
|
Page 14 |
|
|||||||
|
|||||||||
|
Seneca & Chetola Locomotives |
|||||||||
|
|||||||||
| CLICK THE PICTURES | |||||||||
| Gazebo | |||||||||
![]() |
![]() |
![]() |
|||||||
| Gazebo | Finished Gazebo | Gazebo in front of stores | |||||||
| Rebuilding Waterfall | |||||||||
![]() |
![]() |
![]() |
|||||||
| Current waterfall | Dismantled waterfall | Waterfall raised 6 inches | |||||||
![]() |
![]() |
![]() |
|||||||
| Back Fill | Left end | Back of right tunnel | |||||||
![]() |
![]() |
![]() |
|||||||
| Picking Rocks | Right end | Tunnel entrance | |||||||
![]() |
![]() |
![]() |
|||||||
| Filled in from back | Finished back stones | Rocks for back of mountian | |||||||
![]() |
![]() |
![]() |
|||||||
| Back of inner tunnel entrance | Waterfall with 5 new trees | Finished waterfall | |||||||
![]() |
![]() |
![]() |
|||||||
| Preserving trestle | Stones to prevent mulch on track | Building mtn. for mine | |||||||
![]() |
![]() |
![]() |
|||||||
| Jack checks mine mtn. | Mine Entranced | Rear of mine | |||||||
![]() |
![]() |
![]() |
|||||||
| Final touches | Future Engineer | Round rock along pathways | |||||||
![]() |
![]() |
![]() |
|||||||
| 4-6-0 and 2-8-0 Lettering | Lettered Heisler | Shay Lettered | |||||||
![]() |
![]() |
![]() |
|||||||
| Caboose Fleet Lettered 1 | Caboose Fleet Lettered 2 | At the Controls | |||||||
![]() |
![]() |
||||||||
| Observation Car Re-lettered | Passenger Train Re-lettered | ||||||||
![]() |
![]() |
![]() |
|||||||
| Laying mine spur | Tipper and mine spur | Tipper spur base | |||||||
| HOME BACK NEXT | PAGE 14 | ||||||||