Jack's Posts in the trains.com Forum
New Seneca & Chetola Line Forum Post
         
HOME BACK NEXT

 

 

  Page 10

 

4-6-0 Shay
  Seneca & Chetola
Locomotives
 
 
2-8-0 Consolidation  Heisler
 
    2-8-0 Consolidation    
    CLICK THE PICTURES    
   
  Water Tower Construction Foundation In Place Support Post
Upside Down
 
         
   
  Attach Roof On Water Tower Slats Put On Roof Shaved Shingles For Roof  
       
   
  Applying Tank Staves Aligning Staves Locating Straps With Story Board  
         
       
    Strapping Tub    
         
   
  Priming Tub Painting Trap Door Strapping Clamps and Rigging In Place  
         
   
  Waiting Placement Water Tower Placed Hiesler Taking On Water  
HOME BACK NEXT   PAGE 10